DSC Q Series Getting Started Guide
31
Unpacking/Repacking the DSC
The instructions needed to unpack and repack the instrument are found as separate unpacking instructions in
the shipping box and in the online documentation associated with the instrument control software. You may
wish to retain all of the shipping hardware, the plywood, and boxes from the instrument in the event you wish
to repack and ship your instrument.
WARNING: Have an assistant help you unpack this unit. Do not attempt to do this alone.
Installing the Instrument
Before shipment, the DSC instrument is inspected both electrically and mechanically so that it is ready for
operation upon proper installation. Only limited instructions are given in this manual, consult the online
documentation for additional information. Installation involves the following procedures:
•
Inspecting the system for shipping damage and missing parts
•
Connecting the DSC to the TA Instruments controller
•
Connecting cables and gas lines
•
Installing a transformer, if needed, for 230 Vac power
It is recommended that you have your DSC installed by a TA Instruments Service Representative, call for an
installation appointment when you receive your instrument.
CAUTION: To avoid mistakes, read this entire chapter before you begin installation.
Inspecting the System
When you receive your DSC, look over the instrument and shipping container carefully for signs of shipping
damage, and check the parts received against the enclosed shipping list.
•
If the instrument is damaged, notify the carrier and TA Instruments immediately.
•
If the instrument is intact but parts are missing, contact TA Instruments.
Chapter 2
Installing the DSC