background image

 

 

 

T

T

A

A

 

 

I

I

n

n

s

s

t

t

r

r

u

u

m

m

e

e

n

n

t

t

s

s

 

 

P

P

a

a

c

c

k

k

i

i

n

n

g

g

 

 

t

t

h

h

e

e

 

 

Q

Q

1

1

0

0

0

0

0

0

/

/

Q

Q

2

2

0

0

0

0

0

0

 

 

D

D

S

S

C

C

 

 

I

I

n

n

s

s

t

t

r

r

u

u

m

m

e

e

n

n

t

 

 
 
This procedure will cover the steps to properly pack up the Q1000/Q2000 DSC for 
shipment. 
 

 

Packing Materials Provided: 

 

Cell shipping foam w/ clamp 

   Shipping 

plug 

  Autolid 

shipping 

foam 

  2 

Rubber 

bands 

  4 

Shipping 

hooks 

 

 

 

 

Tools Required: 

   Phillips 

screwdriver 

   Flathead 

screwdriver 

 

 

 

3/32” or 5/32” (depending on cooling device) 

   Heavy-duty 

tape 

   Strapping 

kit 

 
NOTE:  If this instrument is equipped with an RCS or LNCS, the flange temperature 

must 

be at ambient temp 

before

 removing the cooling head. 

 

1.  Remove any samples from the cell area. Remove the dust cover and the sample 

tray (if applicable). 

 
2.  Remove the waste bin and insert the shipping plug (Figure 1). 

 

3. For Q1000: 

a.  On the LCD screen, press the “Control Menu” button. 
b.  Press the “Autolid” button so the lid will open. 

For Q2000: 

a.  On the LCD screen, press the “CONTROL” button 
b.  Press the lid icon on the left hand side of the screen. 
c.  The control command should say “LID OPEN”. 
d.  Press “APPLY “button so the lid will open. 

 

4.  Remove the 4 screws that hold on the blue cell dress cover and remove the cover. 

Page 1 of 1 

Reviews: