T
T
A
A
I
I
n
n
s
s
t
t
r
r
u
u
m
m
e
e
n
n
t
t
s
s
P
P
a
a
c
c
k
k
i
i
n
n
g
g
t
t
h
h
e
e
Q
Q
1
1
0
0
0
0
0
0
/
/
Q
Q
2
2
0
0
0
0
0
0
D
D
S
S
C
C
I
I
n
n
s
s
t
t
r
r
u
u
m
m
e
e
n
n
t
t
This procedure will cover the steps to properly pack up the Q1000/Q2000 DSC for
shipment.
Packing Materials Provided:
Cell shipping foam w/ clamp
Shipping
plug
Autolid
shipping
foam
2
Rubber
bands
4
Shipping
hooks
Tools Required:
Phillips
screwdriver
Flathead
screwdriver
3/32” or 5/32” (depending on cooling device)
Heavy-duty
tape
Strapping
kit
NOTE: If this instrument is equipped with an RCS or LNCS, the flange temperature
must
be at ambient temp
before
removing the cooling head.
1. Remove any samples from the cell area. Remove the dust cover and the sample
tray (if applicable).
2. Remove the waste bin and insert the shipping plug (Figure 1).
3. For Q1000:
a. On the LCD screen, press the “Control Menu” button.
b. Press the “Autolid” button so the lid will open.
For Q2000:
a. On the LCD screen, press the “CONTROL” button
b. Press the lid icon on the left hand side of the screen.
c. The control command should say “LID OPEN”.
d. Press “APPLY “button so the lid will open.
4. Remove the 4 screws that hold on the blue cell dress cover and remove the cover.
Page 1 of 1
Summary of Contents for Q1000
Page 4: ...Shipping plug Figure 1 Figure 2 Page 4 of 4...
Page 5: ...Shipping Foam Shipping clamp Figure 3 Figure 4 Page 5 of 5...
Page 6: ...Autosampler Arm Shipping Foam Figure 5 Figure 6 Page 6 of 6...
Page 7: ...Rubberband Shipping Hook One not shown Figure 7 Rubberband Shipping Hooks Figure 8 Page 7 of 7...