7 Creating Web Pages with TAC XBuilder
TAC Xenta 555, Supplement Manual
TAC AB, Oct 2006
04-00054-01-en
9
Check that the question mark icon is replaced by the standard
“link” icon:
10
Generate the project and send it to the Xenta 555.
11
Using a Web browser, verify that the graphic page now links to the
specified schedule.
Notes
•
At the browser, a schedule with grey bars instead of green bars
indicates historical data, that is, schedule data is no longer avail-
able from the MicroNet controller due to a controller fault or a
communications failure.
•
If an existing schedule has never been available to the Xenta 555,
an error message will be displayed at the browser for example,
“Holiday Schedule read error code 42279”. This is due to a com-
munications failure.
Summary of Contents for Xenta 555
Page 1: ...TAC Xenta 555 Supplement Manual...
Page 2: ......
Page 3: ...TAC Xenta 555 Supplement Manual...
Page 7: ...INTRODUCTION 1 About this Manual 2 About TAC Xenta 555...
Page 8: ......
Page 18: ...1 About this Manual TAC Xenta 555 Supplement Manual 18 82 TAC AB Oct 2006 04 00054 01 en...
Page 22: ......
Page 62: ......
Page 80: ...Index TAC Xenta 555 Supplement Manual 80 82 TAC AB Oct 2006 04 00054 01 en...
Page 81: ......