16
17
2.11 SECURING THE ROPE
When the sections are set to the prefered
height. Connect the rope with the security
chain hanging from the end of the
boomhead.
2.12 WIND SPEED INDICATOR
Pressure fit the wind speed indicator on top
of the boom.
The crane is now build in the normal
operational configuration.
READY TO
START LIFTING!