10
11
2.3 LIFTING THE BOOM
Position the boom upwards in your preferred
angle and secure it by fixing both hexagon bolts
in the boom cylinder with the Hex Key.
2.4 LADDERS
The ladders can be positioned
downwards by prying them up a little,
turning them to the side and folding to
the side of the carrier.
2.5 BASE PLATE ATTACHMENT
Optionaly the counterweight
baseplate can be positioned
on the main body for a realistic
configuration.
To connect the baseplate to the crane,
use pins from bag 1 with the tools.