background image

10 

13/10/2016 

A Ground Breaking Company Since 1923      

Warranty

  

 
From the date of purchase your TAEGE machine is covered by a 12-month warranty period 
for faulty parts and/or workmanship.  
 
Ensure your dealer completes and returns a warranty certificate within 7 days of date of 
purchase. 
 

Send to 

Taege Engineering Ltd 
Main West Road  
Sheffield 7500 
New Zealand. 
 
On delivery record the following Basic Information 
 
Model: 
 
Chassis Number:  

 

 
Delivery Date:  

 

Owner: Dealer:  

 

Check for shipping damage. In cases of shipping damage, ask dealer to arrange for 
appropriate claim to be lodged immediately. 

  Ensure the attached registration / warranty validation card has been completed. 

  Place owners copy of warranty in safe place. 

  Check that the Dealers copy of the warranty has been correctly filled out and returned 

to the manufacturer 

  Contact your dealer if you have any further queries. 

  Disclaimer 

  Drilling with Taege® seed drills in conditions normally outside of the germination 

tolerances of the seed concerned cannot be expected to give satisfactory results.  

  Every attempt has been made to ensure the correctness of information and diagrams 

in this manual. Consequently, Taege Engineering Ltd will not be responsible for any 
damage or consequential loss arising out of misinterpretation of, or failure to follow, 
recommended practices and procedures. Nor will Taege Engineering Ltd be liable for 
any damage caused by, or arising out of modification or misuse of its product. Taege 
Engineering Ltd reserves the right to change technical details and prices without prior 
notice. 

A full copy of Taege Engineering Ltd warranty document is available from 

sales@taege.com

 

upon request. 
 

Summary of Contents for M3 Series

Page 1: ...king Company Since 1923 M3 Metering Series Mini Hopper Manufactured by Dealer Local Agent Taege Engineering Ltd Main West Road Sheffield 7500 New Zealand Ph 64 3 318 3824 Fax 64 3 318 3646 E mail sale...

Page 2: ...age Introduction 3 Safety 4 Safe Operating Procedures 5 Maintenance 6 Storage 6 Getting the M3 Mini Hopper ready for the first time 6 Configuration 7 Calibration 7 Fan Speed 7 Operation 7 Bolted Conne...

Page 3: ...extended If you ever lend or sell this machine make sure that the borrower or buyer gets the operator s manual so they will also know how to properly maintain and use it You can download additional co...

Page 4: ...ing around or under the machine Ensure tractor electrics are disconnected and or turned off and machine hydraulics disconnected when working or repairing the Mini Hopper Tighten all nuts and bolts aft...

Page 5: ...vision Never work or walk or allow any person child under the equipment If travelling on the road please ensure that the tractor being used is fitted with the necessary lights turn signals and all oth...

Page 6: ...ing the M3 Mini Hopper ready the first time After you have mounted the unit Plug in the M3 Mini Hopper power lead to the tractor 30amp auxiliary power supply or direct to a 12vdc battery Ensure that t...

Page 7: ...ne gram increments Care must be taken to prime the hopper before calibrating to make sure that no bridging occurs during calibration Comment When calibrating a Taege M3 Mini Hopper ensure that suffici...

Page 8: ...Connections All the bolted connections should be re tightened after the first day or 50Ha of use Daily Maintenance Electrical Connections Drill to tractor auxiliary connection Lead connections Wiring...

Page 9: ...9 13 10 2016 A Ground Breaking Company Since 1923 NOTES...

Page 10: ...py of the warranty has been correctly filled out and returned to the manufacturer Contact your dealer if you have any further queries Disclaimer Drilling with Taege seed drills in conditions normally...

Reviews: