IRDA BGA Rework Station T862++ User Manual
Http://www.tech168.cn
9
T-862++
Operation
1. Starting
1
)
Inspect the infrared lamp body, temperature sensor and power line and
see if they are in good connection.
2
)
Turn on the power switch, then use self-checking first (The previous
setting value demonstrated on the keyboard display monitor after you
turn on the machine).
3
)
Put PCB on the corresponding notch in PCB support, and adjust the
pinch nuts of locating ring and focusing support, then adjust the height of
infrared lamp body, the ideal height between lamp and the unsoldering
article is 20-30mm.
4
)
Locate, choose and attach the appropriate lens
,
The usable of the lenses
diameter are 28mm, 38mm, 48mm.
Infrared Lamp Body
PC Board Support
T
-862++ chassis