Chapter 2 Hardware Installation
17
Chapter 2.
Hardware Installation
2.1
Unpacking
This chapter provides the information for installation of the VENUS 29xx Series.
Before unpacking, make a preliminary inspection of the container. Evidence of
damage should be noted and reported immediately. Unpack the equipment as
follows:
Place the container on a flat surface and open the container.
Carefully take the VENUS 29xx Series out of the container and place it
securely on a flat, clean surface.
Inspect the unit for signs of damage. Immediately report any damage found.
Check the packing list against your order to ensure that the supplied modules
match your order. If modules have been pre-installed in accordance with your
order, check that all the modules are in their proper slots and are secure.
Immediately report any deviations.
Check that all the necessary items have been included, following items are
shipped with your VENUS 29xx Series:
One VENUS 29xx Series Manual (this one)
One AC power cable
Summary of Contents for VENUS 2916
Page 2: ......
Page 10: ...Venus 29xx Series SIP User s Manual viii APPENDIX C CODE DETERMINATION FLOW CHART 209...
Page 67: ...Chapter 3 Configuration and Management 51 Figure 3 27 Ethernet Configuration...
Page 81: ...Chapter 3 Configuration and Management 65 3 5 3 6 SNMP Figure 3 37 SNMP Configuration...
Page 121: ...Chapter 3 Configuration and Management 105 Figure 3 55 Static Routing Configuration...
Page 124: ...Chapter 3 Configuration and Management 108 Figure 3 57 DHCP Server Configuration...
Page 170: ...Chapter 3 Configuration and Management 154 Figure 3 106 Spy command...
Page 172: ......