19
5.2. CUTTING CHAIN TENSIONING
Loosen both nuts (34-Figure: 15) on the fixing plate (35-Figure: 15)
Tighten the tensioning screw (33-Figure: 15) until the chain in tensioned correctly*
Tighten both nuts (34-Figure: 15) on the fixing plate (35-Figure: 15)
*The cutting chain is tensioned correctly when it clings to the lower side of the sawbar when cold and can be
still lifted on the upper side of the sawbar (approximately in the middle), three or four times the height of the
driving teeth.
Always wear gloves when checking the chain tension to avoid cutting your fingers on the sharp chain!
5.3. CHANGING THE SPLITTING WEDGE
Remove all firewood and wood remains from the
splitting wedge area
(splitting chute and under the
machine).
Activate the splitting cylinder and open machine cover when the cylinder reaches the middle position, to
make enough room for splitting wedge replacement.
Put the handle of the splitting wedge (L-Figure: 16) in the right position, to lower the splitting wedge
completely.
Remove the splitting wedge from its mount and replace it with a new wedge (39-Figure: 17).
Close the machine cover.
Set the desired splitting wedge height.
5.4. HYDRAULIC SYSTEM OIL CHANGE
Important:
To prevent pollution of the environment, dispose of used oil properly!
Perform the first oil change after 5000 hours of operation. Afterwards change the oil every 2 years.
The oil drain plug is located on the lower side of the tank.
Hydraulic system oil quantity: 100 l. / 25 gallons.
16
L
16
L
17
39
Summary of Contents for RCA 380
Page 5: ...5 ELECTRIC POWER UNIT EP 12 Tajfun Motor Power 11 kW Weight 211 kg EP 12 ...
Page 12: ...12 7 H P 6 A 11 12 10 ...
Page 30: ...30 ...
Page 31: ...31 ...