4-4
TransporT
hoiSting the machine
• Know and use the correct crane signals.
• Check the hoisting equipment for
damaged or missing parts on a daily
basis and replace as necessary.
• When hoisting, use a wire rope capable
of lifting the machine mass.
• Hoist the machine in such a manner
described in the procedure below. Do
not do it in any other manner. Doing so
is dangerous as it may result in the
machine losing its balance.
• Do not hoist the machine with an
operator on it.
• When hoisting, hoist slowly so that the
machine does not tip.
• Keep everyone out of the area when
hoisting. Do not move the machine over
the heads of the persons.
IMPORTANT: This hoisting method
applies to machines with standard
specifications. The center of gravity
differs according to the attachments and
optional equipment installed.
Contact your Takeuchi service agent for
details.
hoiSting the machine
Hoisting
1. Slew the upperstructure so that the dozer
blade is at the rear of the machine (set the
upperstructure parallel to the track frame).
2. Raise the dozer blade fully.
3. Extend the bucket cylinder and arm
cylinder fully to raise the boom to its
uppermost position.
4. If the boom is swung to either the left or
right side, set it in the neutral position.
5. Raise the safety lock lever to the locked
position.
6. Stop the engine, remove the starter key
and get off the machine.
7. Install the wire ropes as shown on the
figure below. Install the wire ropes and
hoisting attachment without letting them
touch the machine body.
8. Hoist the machine slowly until it leaves the
ground.
9. Stop hoisting until the machine becomes
stable, and then start hoisting the machine
slowly again.
Summary of Contents for 216000002
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 Safety...
Page 46: ...1 36 Safety Safety signs decals...
Page 47: ...1 37 Safety Safety signs decals...
Page 48: ...1 38 Safety Safety signs decals...
Page 49: ...1 39 Safety Safety signs decals...
Page 50: ...1 40...
Page 51: ...2 1 Controls...
Page 67: ...2 17 Memo...
Page 83: ...2 33 Memo...
Page 97: ...3 1 Operation...
Page 127: ...4 1 Transport...
Page 131: ...4 5 Transport Hoisting the machine Cab Canopy...
Page 133: ...5 1 Maintenance...
Page 165: ...5 33 Memo...
Page 191: ...6 1 Troubleshooting...
Page 205: ...7 1 Specifications...
Page 208: ...7 4 Specifications Machine dimensions Cab Machine dimensions...
Page 210: ...7 6 Specifications Machine dimensions Canopy...
Page 212: ...7 8 Specifications Operating ranges Operating ranges...
Page 214: ...7 10 Memo...
Page 216: ...7 12 Specifications Long arm Cab Lifting Capacities...
Page 217: ...7 13 Specifications Long arm Cab Lifting Capacities...
Page 218: ...7 14 Specifications Long arm Canopy Lifting Capacities...
Page 219: ...7 15 Specifications Lifting Capacities Long arm Canopy...
Page 220: ...7 16...
Page 221: ...8 1 Options...
Page 233: ...8 13...