5-57
Maintenance
Installation
1. Use the working equipment to lift the
body.
when required
2. Set the rubber crawler on the sprocket.
3. Set an iron pipe (1) in the rubber crawler
and turn the sprocket slowly in the reverse
direction.
4. Turn until the iron pipe (1) is directly next to
the idler and the rubber crawler lifts away
from the idler, then stop turning the
sprocket.
5. Slide the rubber crawler inward, engage it
on the idler, then pull out the iron pipe.
6. Check that the rubber crawler is securely
engaged on the sprocket and idler.
7. Tighten the rubber crawler to the standard
tension.
Refer to “Inspecting and adjusting the
crawler tension” on page 5-28.
8. Install the other rubber crawler using the
same procedure.
Summary of Contents for 216000002
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 Safety...
Page 46: ...1 36 Safety Safety signs decals...
Page 47: ...1 37 Safety Safety signs decals...
Page 48: ...1 38 Safety Safety signs decals...
Page 49: ...1 39 Safety Safety signs decals...
Page 50: ...1 40...
Page 51: ...2 1 Controls...
Page 67: ...2 17 Memo...
Page 83: ...2 33 Memo...
Page 97: ...3 1 Operation...
Page 127: ...4 1 Transport...
Page 131: ...4 5 Transport Hoisting the machine Cab Canopy...
Page 133: ...5 1 Maintenance...
Page 165: ...5 33 Memo...
Page 191: ...6 1 Troubleshooting...
Page 205: ...7 1 Specifications...
Page 208: ...7 4 Specifications Machine dimensions Cab Machine dimensions...
Page 210: ...7 6 Specifications Machine dimensions Canopy...
Page 212: ...7 8 Specifications Operating ranges Operating ranges...
Page 214: ...7 10 Memo...
Page 216: ...7 12 Specifications Long arm Cab Lifting Capacities...
Page 217: ...7 13 Specifications Long arm Cab Lifting Capacities...
Page 218: ...7 14 Specifications Long arm Canopy Lifting Capacities...
Page 219: ...7 15 Specifications Lifting Capacities Long arm Canopy...
Page 220: ...7 16...
Page 221: ...8 1 Options...
Page 233: ...8 13...