2-52
CONTROLS
LEVERS AND PEDALS
OPERATING LEVERS
• Before starting operation, carefully
check which lever pattern you are going
to use.
• It is described using the ISO pattern in
this manual.
Use these levers to operate the boom, arm,
bucket and upperstructure.
Refer to “Lever pattern” on page 3-6.
Refer to “Operating the working equipment”
on page 3-16.
BLADE LEVER
Use this lever to operate the dozer blade.
(A) .......Blade up
(B) ......Blade down
Refer to “Operating the dozer blade” on
page 3-18.
BLADE /OUTRIGGER LEVER
(IF EQUIPPED)
Use this lever to operate the dozer blade or
the outrigger (if equipped).
Use the outrigger switch to select the dozer
blade or outrigger operation.
(A) .......Blade raise /Outriggers raise
(B) ......Blade lower /Outriggers lower
Refer to “Outrigger switches (If equipped)”
on page 2-44.
Refer to “Operating the dozer blade” and
“Operating the outriggers (If equipped)” on
page 3-18.
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...