4-4
TRANSPORT
HOISTING THE MACHINE
• Know and use the correct crane signals.
• Check the hoisting equipment for
damaged or missing parts on a daily
basis and replace as necessary.
• When hoisting, use a wire rope capable
of lifting the machine mass.
• Hoist the machine in such a manner
described in the procedure below. Do
not do it in any other manner. Doing so
is dangerous as it may result in the
machine losing its balance.
• Do not hoist the machine with an
operator on it.
• When hoisting, hoist slowly so that the
machine does not tip.
• Keep everyone out of the area when
hoisting. Do not move the machine over
the heads of the persons.
IMPORTANT: This hoisting method
applies to machines with standard
specifications. The center of gravity
differs according to the attachments and
optional equipment installed.
Contact your Takeuchi service agent for
details.
HOISTING THE MACHINE
Hoisting
1. Keep the machine configuration as shown
in the figure on the right.
For machines not having the outriggers,
slew the upperstructure so that the dozer
blade is at the rear of the machine (set the
upperstructure parallel to the track frame).
2. Raise the safety lock lever to the locked
position.
3. Stop the engine, remove the starter key
and get off the machine.
4. Install the wire ropes as shown in the
figure on the right.
Install the wire ropes and hoisting
attachment without letting them touch the
machine body.
5. Hoist the machine slowly until it leaves the
ground.
6. Stop hoisting until the machine becomes
stable, and then start hoisting the machine
slowly again.
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...