5-73
MAINTENANCE
Installation
1. Set the O-ring (4) on the bucket as shown
on the figure above.
2. Align the pin hole (A) on the bucket with
the pin hole on the arm (5), and install the
pin (2).
3. Operate the cylinder, align the pin hole (B)
on the bucket with the pin hole on the link
arm (6), and install the pin (2).
4. Align the turn prevention holes, and then
install the bolt (1) and the nut. Be sure to
leave a gap of about 0.5 to 1 mm (0.02 to
0.04 in.) between the nut and bucket
bush, or the nut will come loose.
5. Adjust the gap between the bucket and
the arm.
Refer to “Adjusting the gap between the
bucket and arm (If equipped)” on page
5-74.
6. Slide the O-ring (4).
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the figure above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
WHEN REQUIRED
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...