132
MAINTENANCE
When Required
Adjusting the Gap Between the
Bucket and Arm
WARNING
¡
¡
¡
¡
¡
Before performing maintenance or
repairs under the machine, set all
working equipment against the ground
or in the lowermost position.
¡
¡
¡
¡
¡
To prevent unexpected movement,
securely block the working equipment
when adjusting.
1. Ground the bucket as shown on the
diagram above in a stable position.
2. Check that the bucket dose not move, then
set the safety lock lever to the locked
position and stop the engine.
3. Slide the O-ring (1) to bring the gap (A)
into view and measure the width of the
gap (A).
The gap (A) should be 0.5 mm (0.02 in.)
Swing the buckte slightly to the left and
lightly press the arm point to the left side
of the bucket (the side without an adjuster).
4. Remove the three bolts (2), the end plate
(3) and flange (4).
5. Extract adjustment shim (5) from between
flange (4) and the bucket body according
to gap (A).
Adjustment shim thickness : 0.5 mm (0.02
in.)
Be careful that the gap is no less than 0.5
mm (0.02 in.) after adjustment.
Supplement
Example (for a gap of 2 mm or 0.08 in.):
2 mm – 0.5 mm (standard value)
= 1.5 mm (0.06 in)
In the above example, three shims (5) should
be removed.
6. Insert adjustment shim (5) removed in step
5 above between end plate (3) and flange
(4) and fasten it in place with the three
bolts (2).
• Tightening torque for bolts (2)
54.9 N·m (40.5 ft-lb.)
7. Return the O-ring (1) to their original
position.
E4G050
4
3
2
E4G051
A
5
4
3
2
5
1
E4G048
E4G049
A
1
Summary of Contents for TB175
Page 7: ...4...
Page 9: ...6...
Page 157: ...154...
Page 160: ...157 MEMO...
Page 165: ...162 SPECIFICATIONS Operating Range Mono Boom L3K0021 J K H B A E F C D G...
Page 167: ...164 SPECIFICATIONS Operating Range 2 Piece Boom L3L032 J E F G C D K H B A...
Page 169: ...166 MEMO...
Page 183: ...180...
Page 223: ...220...
Page 224: ...221 INDEX...