146
MAINTENANCE
When Required
Installation
1. Push rubber pin lock (3) into welding
adaptor (4).
Do not let the rubber pin lock stick out past
the welding adapter surface.
2. Install point (2) onto welding adaptor (4).
Insert the point so that the surface behind
the point’s pin hole is flush or deeper than
the surface behind the welding adapter’s
pin hole.
3. Drive in locking pin (1).
After driving in the locking pin, use a pin with
the same surface as the point surface. Do not
use worn locking pins.
�
Side cutter
Installation
1. Insert the bolts from the inner of the bucket
and tighten the nuts.
• Tightening torque: 475 N·m (350 ft-lb)
2. Caulk the bolts with a punch at three spots
along the periphery of the screw to prevent
the nuts from coming loose.
E4G045
3
4
E4G046
4
2
E4G047
1
G4G026
Proper
Improper
Proper
Summary of Contents for TB175W
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 MEMO...
Page 98: ...96...
Page 103: ...101 TRANSPORT 2 Piece Boom Mono Boom Hoisting the Machine...
Page 168: ...166...
Page 171: ...169 MEMO...
Page 172: ...170 SPECIFICATIONS Machine Dimensions W2K0011 K R G J Q P M V W L N D H B C U S T E F A...
Page 174: ...172 SPECIFICATIONS Operating Range 2 Piece Boom W2K002 J E F G C D K H B A...
Page 176: ...174 SPECIFICATIONS Operating Range Mono Boom W2K003 J K H B A D G F E C...
Page 178: ...176 MEMO...
Page 184: ...182...
Page 212: ...210...
Page 213: ...211 INDEX...