150
MAINTENANCE
When Required
4. Line up the turn prevention holes, install
the bolt (1), and the nuts.
Be sure to leave a gap of about 0.5 ~ 1
mm (0.02 ~ 0.04 in.) between the nut and
bucket bush, or the nut will come loose.
5. Adjust the gap between the bucket and
the arm. Refer to page 145.
6. Slide the O-ring (4).
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the diagram above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
E4G055
0.5~1mm
1
E4G056
4
E4G057
3
Summary of Contents for TB175W
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 MEMO...
Page 98: ...96...
Page 103: ...101 TRANSPORT 2 Piece Boom Mono Boom Hoisting the Machine...
Page 168: ...166...
Page 171: ...169 MEMO...
Page 172: ...170 SPECIFICATIONS Machine Dimensions W2K0011 K R G J Q P M V W L N D H B C U S T E F A...
Page 174: ...172 SPECIFICATIONS Operating Range 2 Piece Boom W2K002 J E F G C D K H B A...
Page 176: ...174 SPECIFICATIONS Operating Range Mono Boom W2K003 J K H B A D G F E C...
Page 178: ...176 MEMO...
Page 184: ...182...
Page 212: ...210...
Page 213: ...211 INDEX...