5-41
MAINTENANCE
EVERY 1000 HOURS
7. Start the engine and run it at a speed
slightly above low idling. Raise the water
temperature to at least 90°C (194°F), and
then run the engine for about 10 minutes
with the thermostat open.
8. Stop the engine, wait until the cooling
water temperature becomes lower, and
then remove the drain plug (4) to drain the
water.
9. After draining, clean the cooling system
using a cleaning agent. When using the
cleaning agent, follow the instructions
included with the agent.
10. Repeat the steps 4 to 8 to rinse the
cooling system.
11. Tighten the drain plug (4).
12. Take time and slowly add the new
coolant (mixture of antifreeze and tap
water) to the radiator through the fill port
until it is full.
13. Close the radiator cap (3).
14. Warm up the engine. Use the meters to
check that there are no irregularities in
the cooling system at this time.
15. Increase the water temperature to at
least 90°C (194°F). Then, run the engine
for about 10 minutes with the thermostat
kept open.
16. Stop the engine, wait until the cooling
water temperature becomes lower, and
then check the level of coolant in the
radiator.
If necessary, add cooling water until the
radiator is full.
17. Close the radiator cap (3).
18. Clean the interior of the reserve tank (1),
and then add coolant to the upper limit
(H).
19. When the coolant has been replaced,
inspect the coolant level once again after
operating the machine.
Once the machine is operated, the
coolant is distributed throughout the
entire system, resulting in the lower
coolant level.
Replenish the cooling water that has
been used.
Summary of Contents for TB215R
Page 10: ...0 8 ...
Page 11: ...1 1 SAFETY SAFETY ...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Page 48: ...1 38 ...
Page 49: ...2 1 CONTROLS ...
Page 77: ...3 1 OPERATION ...
Page 107: ...4 1 TRANSPORT ...
Page 112: ...4 6 ...
Page 113: ...5 1 MAINTENANCE ...
Page 149: ...5 37 MEMO ...
Page 169: ...6 1 TROUBLESHOOTING ...
Page 183: ...7 1 SPECIFICATIONS ...
Page 185: ...7 3 MEMO ...
Page 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Page 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Page 190: ...7 8 MEMO ...
Page 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Page 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Page 194: ...7 12 ...
Page 195: ...8 1 OPTIONS ...
Page 203: ...8 9 ...