5-48
MAINTENANCE
WHEN REQUIRED
REPLACING THE BUCKET TEETH
Replace the bucket teeth if the tooth points
are worn. Do not wait until the bucket is
damaged.
• Before performing maintenance or
repairs under the machine, lower all
moveable working equipment to the
ground or in the lowermost position.
• To prevent unexpected movement,
firmly secure the working equipment
when repairing or replacing the bucket
teeth or side cutter.
• When using a hammer, pins may fly out
or metal particles may be scattered.
This may lead to serious injury.
· If hard metal parts such as pins,
bucket teeth, side cutter or bearings
are hit with a hammer, wear protective
gear such as safety goggles and
gloves.
· When hitting pins or bucket teeth,
always check that there is no one in
the surrounding area.
• Do not allow unauthorized personnel in
the work area while working.
WHEN REQUIRED
Replace the teeth if they are worn to 140
mm (5.5 in.).
Removal
1. Clean the bucket and park the machine in
a flat, safe place where the ground is hard.
2. Set the bottom surface of the bucket flat
and lower it on a block so that the bolt (1)
can be taken out.
3. Remove the starter key, and then check
that the bucket is stable.
4. Remove the bolt (1).
5. Remove the teeth (2) and the shim (3).
AD6G028
2
1
4
3
Summary of Contents for TB215R
Page 10: ...0 8 ...
Page 11: ...1 1 SAFETY SAFETY ...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Page 48: ...1 38 ...
Page 49: ...2 1 CONTROLS ...
Page 77: ...3 1 OPERATION ...
Page 107: ...4 1 TRANSPORT ...
Page 112: ...4 6 ...
Page 113: ...5 1 MAINTENANCE ...
Page 149: ...5 37 MEMO ...
Page 169: ...6 1 TROUBLESHOOTING ...
Page 183: ...7 1 SPECIFICATIONS ...
Page 185: ...7 3 MEMO ...
Page 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Page 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Page 190: ...7 8 MEMO ...
Page 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Page 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Page 194: ...7 12 ...
Page 195: ...8 1 OPTIONS ...
Page 203: ...8 9 ...