5-50
MAINTENANCE
REPLACING THE BUCKET
• Before performing maintenance or
repairs under the machine, lower all
working equipment to the ground or in
the lowermost position.
• If maintenance must be performed with
the engine running, always work as a
two person team communicating each
other.
· One person must sit in the operator’s
seat so that he/she can immediately
stop the engine when necessary. He/
she must take care not to touch the
lever or pedal unless necessary.
· The one who performs maintenance
must make sure to keep his/her body
or clothing away from the moving part
of the machine.
• When using a hammer, pins may fly out
or metal particles may be scattered.
This may lead to serious injury.
· If hard metal parts such as pins,
bucket teeth, side cutter or bearings
are hit with a hammer, wear protective
gear such as safety goggles and
gloves.
· When hitting pins or bucket teeth,
always check that there is no one in
the surrounding area.
• When aligning the pin holes, always do
so by checking them visually. Do not
insert your finger in the pin hole, or you
could lose your finger.
Removing
WHEN REQUIRED
1. Lower the bucket to the ground as shown
on the figure above in a stable position.
Note:
When removing pins, set the bucket
so that it is barely touching the ground If the
bucket is firmly touching the ground, the
resistance will be great and it will be difficult
to remove the pin.
2. Set the safety lock lever to the locked
position and stop the engine.
3. Disengage the ring of the lock pin (1) and
remove the lock pin (1).
4. Hammer the pin (2) out of the bucket.
5. Remove the bucket.
Inspect the pin seal (3) and replace it if it is
deformed or damaged. (See next page.)
AD6G033
2
2
3
1
4
Summary of Contents for TB215R
Page 10: ...0 8 ...
Page 11: ...1 1 SAFETY SAFETY ...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Page 48: ...1 38 ...
Page 49: ...2 1 CONTROLS ...
Page 77: ...3 1 OPERATION ...
Page 107: ...4 1 TRANSPORT ...
Page 112: ...4 6 ...
Page 113: ...5 1 MAINTENANCE ...
Page 149: ...5 37 MEMO ...
Page 169: ...6 1 TROUBLESHOOTING ...
Page 183: ...7 1 SPECIFICATIONS ...
Page 185: ...7 3 MEMO ...
Page 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Page 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Page 190: ...7 8 MEMO ...
Page 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Page 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Page 194: ...7 12 ...
Page 195: ...8 1 OPTIONS ...
Page 203: ...8 9 ...