5-51
MAINTENANCE
Installation
WHEN REQUIRED
1. Set the O-ring (4) on the bucket as shown
on the figure above.
2. Align the pin hole (A) on the bucket with
the pin hole on the arm (5), and install the
pin (2).
3. Operate the cylinder, align the pin hole (B)
on the bucket with the pin hole on the link
arm (6), and install the pin (2).
4. Align the turn prevention holes, install the
lock pin (1), and then engage the ring
inside.
5. Slide the O-ring (4).
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the figure above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
AD6G034
1
Summary of Contents for TB215R
Page 10: ...0 8 ...
Page 11: ...1 1 SAFETY SAFETY ...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Page 48: ...1 38 ...
Page 49: ...2 1 CONTROLS ...
Page 77: ...3 1 OPERATION ...
Page 107: ...4 1 TRANSPORT ...
Page 112: ...4 6 ...
Page 113: ...5 1 MAINTENANCE ...
Page 149: ...5 37 MEMO ...
Page 169: ...6 1 TROUBLESHOOTING ...
Page 183: ...7 1 SPECIFICATIONS ...
Page 185: ...7 3 MEMO ...
Page 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Page 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Page 190: ...7 8 MEMO ...
Page 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Page 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Page 194: ...7 12 ...
Page 195: ...8 1 OPTIONS ...
Page 203: ...8 9 ...