3-6
OPERATION
OPERATING THE MACHINE
OPERATING THE MACHINE
LEVER PATTERN (ISO PATTERN)
• Before starting operation, carefully check which lever pattern you are going to use.
• It is described using the ISO pattern in this manual.
Left crawler forward
Right crawler forward
Left crawler reverse
Right crawler reverse
Arm out
Boom lower
Arm in
Boom raise
Upperstructure slew left
Bucket load
Upperstructure slew right
Bucket dump
Boom swing left
Dozer blade lower
Boom swing right
Dozer blade raise
Summary of Contents for TB260
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS Applicable machine models 126100003 or later...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38 SAFETY SAFETY SIGNS DECALS...
Page 49: ...1 39 SAFETY SAFETY SIGNS DECALS...
Page 50: ...1 40...
Page 51: ...2 1 CONTROLS...
Page 111: ...2 61 MEMO...
Page 121: ...2 71 MEMO...
Page 135: ...3 1 OPERATION...
Page 163: ...4 1 TRANSPORT...
Page 167: ...4 5 TRANSPORT HOISTING THE MACHINE...
Page 169: ...5 1 MAINTENANCE...
Page 236: ...5 68...
Page 237: ...6 1 TROUBLESHOOTING...
Page 245: ...6 9 MEMO...
Page 264: ...6 28...
Page 265: ...7 1 SPECIFICATIONS...
Page 268: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 270: ...7 6 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 272: ...7 8 MEMO...
Page 286: ...7 22...
Page 287: ...8 1 OPTIONS OPTIONS...