The Instruction Manual
LEO 320 PROFESSIONAL shredder
Page
16
of
37
TALEX Spółka z ograniczoną odpowiedzialnością
ul. Dworcowa 9c
77-141 Borzytuchom
tel. (59) 821 13 40
e-mail:
biuro@talex-sj.pl
www.talex-sj.pl
5.2.
Leo 320 Professional shredder transportation position
Due to the large dimensions, exceeding the permissible transport width, the shredder
cannot be transport in the working position. According to the traffic law regulations, the
shredder must be pulled behind a tractor, using an additional hitch.
The picture below shows the shredder in the parking position.
When in the parking position, the machine should rest on the support feet (pos. 1, pos. 2)
and on the ground wheels (pos. 3). If we want to transport the shredder, the additional
transport hitch must be deployed (pos. 4). The transport hitch should be deployed and set
in a horizontal position. Use the adjustable support (pos. 2) to adjust it. After levelling out
the hitch, adapt the length of the central coupler (pos. 5). The next step is to close any
covers and check if the transport wheels (pos. 3) are locked in the correct position, as well
as if all the pins are secured from moving by means of safety pins.
After performing the control activities, when everything has been checked, aggregate the
tractor with the machine. After the aggregation, lift the supports (pos. 1, pos. 2) up and
secure them from dropping. Remember to use the warning triangle when moving on public
roads. Remember that after the shredder has been transported to the workplace, the
transport hitch needs to be set in the working position, the additional transport wheel (pos.
3) must be lifted up and the ground wheels moved into the required working position.
The position of the additional transport hitch during work
5
3
1
2
4