24
The machine must be placed and set-up
properly to perform as expected. Follow
these instructions when bringing the Heat
King to a work site and preparing it for opera-
tion.
1. Locate the unit in an area that is firm,
level and with good drainage to minimize
standing water. Be sure there is suf-
ficient space on all sides to access the
machine as required.
2. Level the frame using the jack on the
hitch. Use a carpenters level to be sure.
3. Open all the doors and secure with the
anchor latch on the side of the frame
behind each door. Wait at least 10 min-
utes for the unit to vent and air out before
connecting power wires or starting unit to
allow the fumes and vapors to dissipate.
NOTE
If the frame is not level, the
burners will not be able to use
the total amount of fuel in the
tanks.
LEVELING
HITCH JACK
Set Up