background image

common temperature/speed setting for typical uses. Wait another 10 ~12 minutes before starting the 

lamination job. 

 

Film Thickness 

Temperature 

Speed 

      1.5 Mil (38 Micron)    110°C (230°F)          3 

        3 Mil (75 Micron) 

  115°C (239°F)          4 

        5 Mil (125 Micron)    125°C (266°F)          2 

      10 Mil (250 Micron)    150°C (302°F)          2 

 

LAMINATING PROCEDURES 

 

1. Release the handle from the locked position and insert the handle pin into the “MIN” notch to 

    engage the rollers. The user can now start laminating as the machine starts feeding in film.   

2. To put the lamination temporarily on hold without turning off the machine, the user can release 

    the handle and reinsert in any of the notches from 3/16” and higher. This will separate the rollers 

    and stop the motor from feeding more film. 

  3. Pull the handle back to the “MIN” setting to reengage the rollers and resume the lamination job. 

 

       

 

 
(2) ONE-SIDED LAMINATION   
 

LOADING THE FILM 

 

Unpack only the upper rod. Install nylon or thermal film on 1” or 3” cores by following an 

adapter---film----adapter sequence onto the rod and fit the adapters onto the paper core. Leave equal 

lengths of the rod out of each end. Use the guide to position the roll of film then tighten the screw on 

the adapter to secure the roll film. Load the rod on the laminator. 

 

 

 

 

Summary of Contents for TCC1200

Page 1: ...45 Wide Format Hot and Cold Laminator...

Page 2: ...chine with a damaged cord or plug or after the machine malfunctions has been dropped or is damaged in any manner Return the machine to the nearest authorized service facility for examination repair or...

Page 3: ...e Overlap will cause the top film to deposit adhesive on the hot rollers and pull rollers so this procedure is critical 3 Make sure the film is correctly threaded based on the threading guide A thread...

Page 4: ...emporarily on hold without turning off the machine the user can release the handle and reinsert in any of the notches from 3 16 and higher This will separate the rollers and stop the motor from feedin...

Page 5: ...light will turn on Once the set temperature is achieved and roller temperature is stabilized the machine will start beeping and the ready light will turn on Once the ready light stays on you can set t...

Page 6: ...and lean the glossy side evenly to the top feed roller 4 Take the leading edge of the threaded Kraft paper and apply evenly onto about an inch from the leading edge of the adhesive side of the lamina...

Page 7: ...will separate the rollers and stop the motor from feeding more film 5 Pull the handle back to the MIN setting to reengage the rollers and resume the lamination job B FOOT PEDAL OPERATION This machine...

Page 8: ...the plates on both sides of the tray F REVERSE FUNCTION The machine is equipped with a REVERSE function By pressing the REVERSE key the machine will release the documents out from the front of the ma...

Page 9: ...hine up for COLD LAMINATION 2 As soon as the user has set up the machine simply align the print evenly onto the board release the handle from the locked position and pull towards the desired notch bas...

Page 10: ...AIN TIME TEMPERATURE STARTS COOLING DOWN TO 100 C 212 F AFTER 60 MINUTE PERIOD STAGE 3 END USER RETURNS AFTER 60 MINUTE PERIOD RESETS MOTOR SPEED OR STEPS USER CAN START ON FOOT PEDAL PCB STOPS COUNTI...

Page 11: ...f the heat We recommend turning off the machine only after the roller temperature is lower than 50 C 122 F Make sure the rear fan switch is also turned off In case you need to turn the machine off whi...

Page 12: ...ranty claims and or repairs simply arrange for a return authorization number with your dealer and send the machine back in its original packaging with a copy of the original receipt or invoice to show...

Reviews: