background image

Page 2 of 3

1

3

5

7

2

4

6

8

Product Name: 

+44(0)1952 292441
technical@tamlite.co.uk

Document No: 

V1

Tamlite Technical
Stafford Park 12, 
Telford, Shropshire, 
TF3 3BJ

INSTALLATION & OPERATING INSTRUCTIONS

IP65

IK

220-240V

50/60Hz

ta

-20°C to 25°C

5°C to 25°C

for M3 variants

Arrow points to Pathway

Remove the product from its packaging.

Remove the three screws to release the base plate.

Locate the position of the J bolts using the base plate.

Set into wet pour concrete with supply lead access in the centre.

Once the concrete is set secure the base plate with four M10 nuts.

Remove the three screws from the bollard to release the lamp head.

Bring in supply cable and feed it through the bollard.

Unscrew the gear enclosure cover and feed supply cable through the gland.

Reviews: