background image

TCWS.54NG04.C1 181208-16

2      3.4 LBS SAND

1     HARDWARE PACK

2     EQUALIZER ROCKS

1     1/2 SS FLEX LINE

1     PILOT ASSEMBLY

2     BURNER ASSEMBLIES

BURNER TRAY ASSEMBLY

4 PEBBLE 

SETS

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

2

Contents of Package

Summary of Contents for TCWS.54NG04.C1

Page 1: ...ting Instructions supplied with the fireplace and should be kept together Refer to the Installation and Operating Instructions for proper gas supply safety requirements and operating instructions TCWS...

Page 2: ...4 C1 181208 16 2 3 4 LBS SAND 1 HARDWARE PACK 2 EQUALIZER ROCKS 1 1 2 SS FLEX LINE 1 PILOT ASSEMBLY 2 BURNER ASSEMBLIES 1 BURNER TRAY ASSEMBLY 4 PEBBLE SETS A A B B C C D D E E F F G G H H 2 Contents...

Page 3: ...to burner installation Page 23 1 Attachfuelflexlineandpilotassembly to bulkhead fittings Fig 1 2 Connect spark electrode wire ORANGE to the rear electrical bulk head fitting Connect the flame sensor w...

Page 4: ...s to both orifice assemblies on the mounting brackets Fig 4 CAUTION Ensure that all connections are gas tight 5 Tilt burner tray length wise and insert into the firebox Fig 5 6 Attach pilot to burner...

Page 5: ...lifting at a location pin on therightsideoftheburner Repeat with left burner Fig 8 CAUTION The burners should be tightly butted up against each other at the center to ensure correct operation 9 Place...

Page 6: ...s start from the right hand side of the burner and ensure that the arrow on each rock points towards the front of the fireplace Fig 11 to 22 10 Eachrockhasaslotinit sbaseandis marked with a letter and...

Page 7: ...aincover wideedge should face the front Fig 23 13 Place the two remaining rocks on the left hand end of burner as shown Fig 21 and 22 12 Repeat the sequence of placing the rocksthreemoretimesuntiltheb...

Page 8: ...gas supply and electrical power shall be shut off before proceeding with the conversion Note Factorysuppliedcomponentsmustbeusedto ensurecorrectinput Afterconversionconfirm proper manifold pressure 1...

Page 9: ...e minimum rate screw is sealed with an O ring Use a thin bladed screwdriver to back the screw out past the limit of the threading At this point a groove on the screw body will be visible just above th...

Page 10: ...he pressure regulator Fig 32 11 Pressdownonthecenterpostandrotate 90 The center post should stay down Fig 33 Replace the rubber cap 13 Fill in the date and the name of the person who performed the con...

Page 11: ...ant will be required to ensure a gas tight connection Note To test the gas pressure turn off the gas supply before removing the plug from the supply pressure test port or manifold pressure test port V...

Page 12: ...ameappearanceafter the fireplace has reached operating temperature See Fig 39 for proper flame pattern Open primary air if the window glass and firebox have carbon accumulation and or the flames are l...

Page 13: ...SUPPLY TUBE 5019 223 4 PILOT ASSEMBLY TCRP 5005025C 5 ORIFICE NATURAL GAS 32 5021 332 A ITEM DESCRIPTION PART NO 7 PROPANE CONVERSION KIT TC36 LPCSTE01 8 SAND TC42 SAND34 Two Bags Per Kit 9 TRIM ROCK...

Page 14: ...Notes...

Page 15: ...Notes...

Page 16: ...Printed in Canada Technical support 1 877 715 2664 Web site www townandcountryfireplaces net 2975 Allenby Rd Duncan BC V9L 6V8...

Reviews: