7
Scheduled Maintenance
Before Use
Update settings, replace items, or call for service as necessary according to the results
of the visual inspections. Do not use the unit if you see any signs of damage. Equipment
that has been damaged must be checked for proper operation by qualified personnel
before using again.
TANITA recommends that each facility conduct periodic checks of each unit.
1. Check the following at least daily:
• The unit is on a stable and level surface ie on a firm flooring, not on a thick carpet
• Date and time settings
2. Visually inspect the following at least weekly:
• The display for any damage or contamination
• All cables, cords, and connector ends for damage or contamination
• All safety-related labeling for legibility
• All accessories (sensors, electrodes, etc.) for wear or damage
3. Visually inspect the following at least monthly:
•Mounting screws on stand
en
Required
Summary of Contents for MC-780MA-N
Page 26: ...MEMO...
Page 27: ......