11
Performance tests shall be conducted on the Crossfire Monitor after a repair, or anytime a problem is reported to verify operation in
accordance with Task Force Tips test procedures. Consult factory for the procedure that corresponds to the model and the serial number
of the Monitor. Any equipment which fails the related test criteria should be removed from service immediately. Troubleshooting
guides are available with each test procedure or equipment can be returned to the factory for service and testing.
6.1 GREASE WORM GEAR
Turn the handwheel to move the nozzle to its highest elevation and pump grease (medium viscosity automotive) into
the fitting in the worm gear housing until excess appears.
6.2 PERFORMANCE TESTS
7.0 SPECIFICATIONS
CROSSFIRE Monitor
STOW-A-WAY 800 Base*
Weight
Storage Volume
L-W-H
Height Above Truck Flange
Height Above Truck Deck (min)
Height Above Ground on Base
Line of Reaction Force Above Ground
Flow Area (minimum)
Maximum Flow
Maximum Pressure
Materials Used
Inlets Available
17 lbs
6.7 kg
4060 in
.066m
20" x 14-1/2" x 14"
.51 x .37 x .36m
12-1/2 in
320mm
14 in
360mm
16-1/2 in
420mm
4 in
100mm
8.3 in
5360mm
1250 GPM
5000 L/min
175 PSI
12 bar
Cast Aluminum, Aluminum,
Stainless Steel
One
3
3
2
2
20.7 lbs
9.4 kg
1620 in
.027m3
20" x 9" x 9"
.51 x .23 x .23m
NA
NA
NA
NA
8.3 in
800 GPM
3000 L/min
175 PSI
12 bar
Cast Aluminum, Aluminum,
Stainless Steel
Numerous Single & Double Inlets
2-1/2 " - 6"
3
2
5360mm
2
Dimensions shown for STOW-A-WAY 800 portable base with double inlet 2-1/2" model.