GTS
Technical Manual
26. March 2013
Edition: V2.00/2013
5-15
Copyright © 2013, Diversey Inc.
05.
11.1
2 g
ui
de b
ar
-
bo
wd
en
ca
bl
e h
an
dle
old
s
etu
p -
35
0B_
V1.0
0.fm
5.2
Guide bar
5.2.4
Removing of bowden cable handle adjustment old setup
Picture 24: Guide bar
•
Remove cover (02/103) according to chapter ADJUSTING OF
BOWDEN CABLE HANDLE ADJUSTMENT.
•
Release the counter nut with a 10mm fork spanner.
•
Loosen the tension of the bowden cable with a 8mm fork
spanner.
•
Lift bowden cable out of the articulation (02/113).
•
Position spring upwards over the adjustment screw.
•
Remove the end bolt of the bowden cable at the lock (02/110) of
the handle position.
•
Remove handle cover according to chapter REMOVING OF
HANDLE COVER AND ELECTRONICS.
•
Remove the end bolt of the bowden cable (02/101) on the
handle adjustment lever (01/116).
Picture 25: Guide bar
•
Thread out the bowden cable.
To Order Parts Call 1-888-702-5326 - https://monsterfloorequipmentparts.com