TATSUMAKI
-
1375 Egbert Ave., San Francisco, CA 94124
Tel: 1-888-725-0989 Fax: 415-671-0839
E-mail: info@gotatsumaki.com | Website: www.GoTatsumaki.com
INSTALLATION
1. Disconnect and move freestanding range from
cabinet opening to provide easier access to
rear wall. Put a thick, protective covering over
cook top, set-in range or countertop to protect
from damage or dirt. For maximum perform-
ance, install the range hood 25.5” to 29.5”
above the cook top.
25.5”
-
29.5”
2. For the most secure installation, the mount-
ing screws should be installed on brick wall or
solid wood.
3. Create three 5/16 inch holes on the wall, then insert the screw plug provided and
secure the bracket with screws provided.
4. Attach the range hood to the installed bracket.
5. For ducted installation, determine and make all necessary cuts in the wall for the
ductwork. Install the ductwork before the range hood.
Screws
Wall Bracket
Screw Plug
Holes on Wall