2. To the operator
Lifting points
This equipment has adequate lifting points located on the frame. When carrying out
the maintenance or transporting the equipment, it is essential to hitch the cables to all of
these points.
- Only
CAPABLE
and
AUTHORIZED
personnel should carry out the equipment
movimentation.
- Note every condition of each PPE, such as the foot protection, safety glasses,
safety helmet, protective gloves and other PPE as required.
- Use chains, of at least 3 meters long, to lift the equipment safely.
- Use the adequate points for lifting and be sure that the equipment is safe. Avoid
accidents.
- Always isolate the area where the lifting and components movimentation will be
carried out. Always keep a safe distance from the equipment.
ATTENTION! RISK OF ACCIDENT