41
5.4
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Display console
C
I
Plastic covers
C
I
Moisture of the felt brake
I
Screws and cable connections
I
Check pedals for tightness
I
Legend: C = clean; I = inspect
6
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an electricals recycling centre. Further information can be
obtained from your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Summary of Contents for CVEB2517
Page 2: ...2 Z9 9 Pro...
Page 13: ...A M N L 35L L35R L R D 1 P 11 C O 1 B 1 E 1 13 Manual...
Page 34: ...34 Z9 9 Pro...
Page 35: ...35...
Page 37: ...37 Example of an app Overview of apps and possible software updates...
Page 47: ...47 8 3 Exploded Drawing...
Page 48: ...48 Z9 9 Pro...
Page 53: ...53 Notes...
Page 54: ...54 Z9 9 Pro Notes...
Page 55: ...55...
Page 56: ...Taurus Smart Bike Z9 9 Pro...