6-4
OPERATING PROCEDURES
Models C001 and C002
Operating Procedures
6
8. Place the assembled flow regulator into the hopper
for sanitizing.
9. Install the rear bearing drip pan.
10. Put the sanitized hopper gasket on the hopper cover.
Figure 6-14
Repeat these steps for the other side of the freezer.
Sanitizing
1. Prepare an approved 100 ppm sanitizing solution
(examples: 2-1/2 gal. [9.5 L] of Kay- 5® or 2 gal.
[7.6 L] of Stera-Sheen®).
Use warm water and
follow the manufacturer’s specifications.
2. Pour the sanitizing solution into the hopper.
3. While the solution is flowing into the freezing cylinder,
brush-clean the mix hopper. When cleaning the
hopper, take particular care in brushing the mix inlet
hole and the flow regulator.
4. Place an empty pail under the draw plate. The pail
can be hung from the handscrews on the freezer
door.
5. Place the DASHER switch in the ON position for 5
minutes.
In order to avoid having sanitizer splash out when the
draw plate is opened, place the DASHER switch in
the OFF position. Open the draw plate and place the
DASHER switch in the ON position. Drain the
sanitizer into an empty pail. Place the DASHER
switch in the OFF position and close the draw plate.
KEEP FINGERS OUT OF FILL AND
DISCHARGE OPENINGS.
Failure to do so may result in
severe personal injury, contaminated product, or
component damage.
Repeat these steps for the other side of the freezer.
Priming for Continuous Run
1.
With sanitized hands,
remove the flow regulator
assembly from the mix hopper and set it on a clean,
dry surface. Place an empty pail under the draw
plate.
2. Pour 1 to 2 cups (1/2 L) of mix into the hopper to
remove the remaining sanitizing solution from the
freezing cylinder.
3. Open the draw plate on the freezer door and place
the DASHER switch in the ON position.
Repeat steps 1 - 2 for the other side of the freezer.
KEEP FINGERS OUT OF FILL AND
DISCHARGE OPENINGS.
Failure to do so may result in
severe personal injury, contaminated product, or
component damage.
4. Install the large hopper cover on the hopper.
5.
With sanitized hands,
install the flow regulator
through the hopper cover. Align the flow regulator
with the slots on the hopper cover. The flow regulator
can be positioned to allow the numbers to be read
from the front, back or either side.
6. Pour mix into the hopper and fill it to 1/2 in. (13 mm)
below the air inlet on the flow regulator.
7. Place the FREEZE/CHILL switch in the FREEZE
position and the HOPPER REFRIGERATION switch
in the ON position.
8. Allow the machine to run for 2 minutes. Set the flow
regulator between S - 1.
9. Install the small hopper lid.
Repeat steps 4 - 9 for the other side of the freezer.
17042
Summary of Contents for C001
Page 22: ...5 4 USER INTERFACE Models C001 and C002 User Interface 5 Notes...
Page 36: ...9 2 PARTS REPLACEMENT SCHEDULE Models C001 and C002 Parts Replacement Schedule 9 Notes...
Page 40: ...10 4 LIMITED WARRANTY ON MACHINES Models C001 and C002 Limited Warranty on Machines 10 Notes...
Page 44: ...11 4 LIMITED WARRANTY ON PARTS Models C001 and C002 Limited Warranty on Parts 11 Notes...