background image

Weekly Cleaning 

(continued)

 

 

©McDonald’s Corporation · Planned Maintenance Manual · January 2011 

Page 2 of 7

 

Tay

lor

 C

om

pany
 B

lende
d I

ce M
ac

hin

e M
od

el C

02

W

eek

ly 

BE

  2

2 W

 

 

Reinstall the ice hopper 
cover.  
 
Press the ICE key until all 
remaining ice has dispensed 
into the blender pitcher. 

 

Remove the blender pitcher 

and discard the ice. 

Remove the blender pitcher 
and discard the ice into the 
back sink. 

 

Remove the ice hopper, ice 

hopper cover, splash guard, 

and ice chute for cleaning. 

 

10 

Remove additional parts for 

cleaning.  

 

Blender pitchers 

 

Skirt 

 

Syrup rail 

 

Rinse station assembly 

(grate, actuator, strainer) 

 

Pitcher drying station 

(pitcher grate, drip pan) 

 

Lid holders 

 

Whipped cream holder 

    and cover 

 

11 

Remove the product bins for 

cleaning. 

 
Remove the product bags 
from the product bins and 
place them in the walk-in 
cooler. 

 

12 

Remove the product bin 

shelves and the bottom 

cabinet drip pan for cleaning. 

 

13 

Wash, rinse and sanitize all 

parts. 

Wash, rinse and sanitize all 
parts in the 3-compartment 
sink. 

DO NOT PLACE IN

 

POWER SOAKER SINK OR 

DISHWASHER. 

 

Important:

 Make sure the 

water is fresh and clean.  

 

APSC & Solid Sense 
Sanitizer

 

 

 
 
 
 

14 

Additional pitcher cleaning. 

To remove film build-up on 
the inside of the blender 
pitchers, place the pitchers in 
the 3-compartment sink. Add 

KAY beverage equipment 
cleaner tablet

 into one 

pitcher . Fill the pitcher with 

hot

 water and allow it to 

soak. After 5 minutes, wear 
protective gloves and remove 
residual soil with a no-scratch 
pad.  
 

Note: Use caution when 
cleaning the blender blade. 
 

 

Kay Beverage Equipment 
Cleaner 

 

 

 

Transfer the solution into the 
second pitcher and repeat the 
procedure. Once this is 
completed, discard the 
solution. Rinse and sanitize 
the pitchers in the 3-
compartment sink. Allow the 
pitchers to air dry. 

 

Summary of Contents for C029

Page 1: ...tch Pad BIO SHIELD Beverage Tower Drain Cleaner Ice Scoop Brushes Squeeze Bottle Sanitized Towel Safety Glasses Weekly Cleaning Procedure 1 Press the MENU key to display the Main Menu screen Pressing...

Page 2: ...bins and place them in the walk in cooler 12 Remove the product bin shelves and the bottom cabinet drip pan for cleaning 13 Wash rinse and sanitize all parts Wash rinse and sanitize all parts in the...

Page 3: ...8 Install cleaning tubes Install cleaning tubes onto all inlet fittings Place the other end of the cleaning tubes into the bucket of SolidSense APSC solution SolidSense APSC solution 19 Re install rin...

Page 4: ...ipe inside of cabinet door and inlet fittings Wipe the inside of the cabinet door and the inlet fittings using KAY 5 Sanitizer solution and a clean sanitized towel Kay 5 Sanitizer solution 29 Sanitize...

Page 5: ...rinse station Using the spray bottle of KAY 5 Sanitizer and the spout brush brush clean the rinse station Kay 5 Sanitizer solution 38 Re install rinse station assembly and pour sanitizer into rinse s...

Page 6: ...er 45 Pour two full pitchers of hot water from the back sink into the dispenser 46 Quickly pour one packet of BIO SHIELD Beverage Tower Drain Cleaner into the dispenser Immediately replace and tighten...

Page 7: ...e BIO SHIELD dispenser by turning the knob counter clockwise 51 Remove the cap from the BIO SHIELD dispenser 52 Rinse the BIO SHIELD dispenser Rinse the BIO SHIELD dispenser with warm water and return...

Reviews: