27
Model C300
Operating Procedures
Note:
The position of the handle on the syrup
sampling valve determines the direction of product
flow. The down position opens the syrup sampling
valve for collecting brix samples. The center position
shuts off the product flow. The up position directs
the flow of product to the freezing cylinder.
Step 11
Place a pail beneath the door spout. Open the draw
valve and drain the freezing cylinder to remove any
incorrectly brixed product. Close the draw valve.
Step 12
Slowly open the prime plug.
Step 13
Press the PRIME (+ + +) key. Allow the liquid level
to fill to the prime plug hole.
Step 14
Press the OFF (<-- --) key and close the prime plug.
Repeat Steps 1 through 14
for the other freezing
cylinder.
Step 15
To place the freezing cylinders in the AUTO mode,
press the AUTO (-- -->) key on both sides. When the
unit cycles off, the product will be at serving
viscosity.
Figure 40
Step 16
Close the lighted display when complete. Replace
the panels and attach with screws. Install the front
drip tray and the splash shield on the front of the
freezer.
Figure 41
120 Day Closing Procedure
We recommend that the machine be completely
disassembled and cleaned at least every 120 days
using the following procedures.
ALWAYS FOLLOW LOCAL HEALTH CODES
To disassemble the Model C300, the following items
will be needed:
S
Two cleaning pails
S
Necessary brushes (provided with freezer)
S
Cleaner
S
Single service towels
Summary of Contents for C300 NP
Page 51: ...Model C300 059540 27 4 11...
Page 52: ...Model C300 059540 33 4 11...
Page 53: ...Model C300 059540 40 4 11...
Page 54: ...Model C300 059540 58 4 11...