C713 Operator Training
C713 Operator Training
14
C713 Operator Training
C713 Operator Training
Step 18
Snap the design caps over the bottom of the door spouts.
Step 19
Slide the two drip pans into the holes in the side panels.
Step 20
Install the front drip tray and splash shield under the door spouts.
Step 21
Slide two o-rings on one end of the feed tube. Slide two o-rings on the other end of the feed tube.
Step 22
Slide the small o-ring into the groove of the air orifice. Do not lubricate the o-ring.
Note: Make sure the hole in the air orifice is clean and is not clogged. If the hole in the air orifice
should become clogged, use soap and hot water to clear the hole. Do not enlarge the hole in the air
orifice.
Step 23
Install the air orifice into the hole in the top of the feed tube (end without the small hole on the side).
Step 24
Lay the feed tube (with the air orifice installed) in the bottom of the mix hopper for sanitizing.
Step 25
Repeat steps 21 through 24 for the other side of the machine.