2022-012-R-0017-A2_Draft 4
8
O T I M U S
S O R T E R S
Gateway
2. The solar panels (A) are installed and
the smart modules (B) are connected.
3. The inverter is installed.
Warning
:
- Obey the instructions that come with the
solarpannels, the smart modules and the
inverter.
- When the photovoltaic array is exposed
to light, it supplies a DC voltage.
- +
- +
B
A
2
5 Installation
2
Design rules
- Multiple orientations within one string are allowed
- Each orientation should reach the start-up voltage (input DC)
7
5.1 Preliminary requirements
1. Scan the barcode of each individual
solar panel. In the onboarding
application on your mobile device, On
the 'Scan' screen (A), select the 'Scan'
button (B).
4
3
2
1
9
10
XXXXXXXXX
B
A
1