34
Models C708 & C716
Operating Procedures
To INCREASE the flow rate, turn the adjustment
screw CLOCKWISE. To DECREASE the flow rate,
turn the adjustment screw COUNTER-
CLOCKWISE.
Step 9
Snap the design caps over the bottom of the door
spouts.
Step 10
Slide the two rear drip trays into the holes in the
back panel. Slide the two drip pans into the holes in
the side panels. (See Figure 31.)
Figure 31
Step 11
Install the front drip tray and splash shield under the
door spouts. (See Figure 32.)
Figure 32
Mix Pump Assembly
Step 1
Inspect the rubber pump parts. O-rings and gasket
must be in 100% good condition for the pump and
entire machine to operate properly. The o-rings and
gasket cannot properly serve their intended function
if nicks, cuts, or holes in the material are present.
Replace any defective parts immediately and
discard the old.
Step 2
Assemble the piston. Slide the red o-ring into the
groove of the piston. DO NOT lubricate the o-ring.
(See Figure 33.)
Figure 33
Step 3
Apply a thin layer of lubricant to the inside of the
pump cylinder at the retaining pin hole end. (See
Figure 34.)
15130
L U B E
R
Figure 34
Summary of Contents for Wawa C708
Page 1: ...Models C708 C716 Heat Treatment Soft Serve Freezer Operating Instructions 059061 M 6 17 08...
Page 71: ...Model C708 057010 27 Rev 2 08...
Page 72: ...Model C708 057010 27 Inset Rev 2 08...
Page 73: ...Model C708 057010 33 Rev 2 08...
Page 74: ...Model C708 057010 40 Rev 2 08...
Page 75: ...Model C708 057010 58 Rev 2 08...
Page 76: ...Model C716 059900 27 Rev 2 08...
Page 77: ...Model C716 059900 27 Inset Rev 2 08...
Page 78: ...Model C716 059900 33 Rev 2 08...
Page 79: ...Model C716 059900 40 Rev 2 08...
Page 80: ...Model C716 059900 58 Rev 2 08...