ES100 ESS Unit user manual
13
3.2.1 Installation preparation
1. Prepare equipment and tools for installation.
2. Check the battery and confirm that the ON/OFF switch is in the "OFF" state to ensure no live
operation.
3.2.2 Mechanical installation
Installation method 1: With Cabinet installation
1. Place the battery cell on the cabinet bracket as shown in the figure and push it into the
installation position of the cabinet. (The cabinet structure in the figure is for reference only)
Figure 3-2
2. Secure the battery cell on the cabinet with a nut through the mounting holes on the top of the
battery hanging ears.
Figure 3-3
Installation method 2: With Simple bracket installation
1. Place the battery and a bracket as shown in the figure3-4, and insert the battery into the bracket.
Figure 3-4
Summary of Contents for ES100
Page 1: ...1 ...
Page 2: ...1 ES100 ESS Unit User Manual ...
Page 24: ...ES100 ESS Unit user manual 18 ...