6. STEERING SYSTEM
- 99 -
Fig. 6.47
Fig. 6.48
Fig. 6.49
Fig. 6.50
⑬
Leave your hand from the worm shaft. Caulk
the nut at two positions by the caulking jig (See
Fig. 6.61).
⑭
Make sure that the nut does not show looseness
when the worm shaft is turned clockwise. If
still loose, caulk the nut again.
⑮
Install the O-ring in the O-ring groove. Then
install the front cover.
Tightening torque: 34.3 to 53 N-m
{3.5 to 5.4 kgf-m}
[25.3 to 39.1 lbf-ft]
⑯
Make sure that the total number of turns of the
worm shaft is 4.6 or more. If not so, go back to
step
⑤
.
Summary of Contents for FB10-7
Page 2: ......
Page 4: ...No SEB 81BBE...
Page 8: ...No SEB 81BBE...
Page 9: ...No SEB 81BBE Fig 1 Overall Dimensions Unit mm in...
Page 10: ...No SEB 81BBE...
Page 28: ...1 BATTERY AND CHARGER 16 NOTE...
Page 30: ...2 MOTORS 18 DRIVE UNIT Fig 2 1 Drive Motor Installation DRIVE AXLE DRIVE MOTOR...
Page 42: ...3 CONTROL SYSTEM 30 Fig 3 2 Inverter Assembly 1 0 to 2 5 ton Trucks...
Page 43: ...31 3 CONTROL SYSTEM Fig 3 3 Inverter Assembly 3 0 to 3 5 ton Trucks...
Page 44: ...3 CONTROL SYSTEM 32 Fig 3 4 Controller Wiring 1 0 to 2 5 ton Trucks...
Page 45: ...33 3 CONTROL SYSTEM Fig 3 5 Controller Wiring 3 0 to 3 5 ton Trucks...
Page 133: ...7 HYDRAULIC SYSTEM 121 Fig 7 27 Remove the oil seal from the front cover...