background image

REV 2.3 

 

     © 2012 TCW Technologies, LLC. 

7

Emergency Procedure for loss of main aircraft electrical power: 
 

1)  Operate the Aircraft Master Power Switch per the Emergency Procedure checklist 

already established for the aircraft. 

2)  Ensure the Back-up Master Switch is in the ON position. 
3)  Land aircraft as soon as practical to resolve the loss of main electrical power. 

 
 

Requirements for continued airworthiness: 

 

On at least an annual basis the endurance capability of the IBBS system shall be confirmed and 
compared against the back-up endurance required for the connected equipment. 
 

As an alternate to these tests, the IBBS unit may be returned to TCW Technologies for 
a loaded endurance test, contact TCW Technologies for details.

 

 

Procedure for endurance testing (all applications except electronic ignition 
systems): 

 
1)  Turn off the Aircraft Master Switch 
2)  Turn on the Back-up Power Master Switch 
3)  Turn on all equipment connected to and supplied with back-up power from the IBBS 

product. 

4)  Measure and record at least the following information: The time until the first piece of 

connected equipment no longer functions or the time until the output of back-up 
power supply voltage drops to 9.5 volts.  AVOID allowing the back-up battery voltage 
to fall below 9 volts.  Allowing the voltage to fall below 9 volts is detrimental to the life 
and performance of the battery pack.    

5)  After completing the endurance test, recharge the IBBS product by operating the 

system with the Aircraft Master Switch in the ON position for up to two hours.   This 
may done by operating the aircraft in conditions known to not require back-up power 
or by powering the aircraft system on a suitable ground power source as described 
in the section: Ground Base Recharging. 

6)  Record the results of the endurance testing in the aircraft log book. 
7)  If the IBBS no longer meets the endurance testing requirement, the back-up battery 

may need replacement. 

 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for IBBS-12v-2ah

Page 1: ...output power during normal and emergency operations The IBBS system also provides an output signal to communicate the operating state of the back up bus as well as the state of the battery The IBBS sy...

Page 2: ...lect an installation location that will comply with these requirements 4 Connect the aircraft wiring according to one of the wiring diagrams shown The IBBS must be powered through a properly sized cir...

Page 3: ...tem connections directly to aircraft battery must be utilized as shown 8 When using the IBBS product to provide back up power to an electronic ignition system CDI pullable circuit breakers must be use...

Page 4: ...on the input of the IBBS the info line may be read to determine the internal battery voltage A nominal battery with a full charge will read between 12 and 15 volts When the IBBS is on line providing b...

Page 5: ...harged battery the following average performance can be expected in terms of operating duration The operating duration is for output voltage down to 9 5 volts Nominal Current Draw Duration total conne...

Page 6: ...procedures Start up Procedure 1 Prior to turning on the Aircraft Master Switch turn ON the Back up Power master switch 2 Turn on any equipment that derives back up power from the IBBS product 3 Ensure...

Page 7: ...he Back up Power Master Switch 3 Turn on all equipment connected to and supplied with back up power from the IBBS product 4 Measure and record at least the following information The time until the fir...

Page 8: ...operation based on the use of only the electronic ignition module provided with back up battery power 3 PULL the 5 amp breaker feeding the Back up Master Switch confirm engine continues to run 4 PULL...

Page 9: ...ullable breakers to the normal ON position and ensure aircraft engine is properly returned to the off position by following normal run and shut down procedures 10 After completing these tests recharge...

Page 10: ...l high performance fast charger Surge Protection 16 volt active clamp 1500w 10 1000uS waveform Wiring CPC connector with Mil spec machined contacts Field replaceable inline fuse AGC 7 5 Enclosure Cast...

Page 11: ...rness PIN Description Wire Color optional harness 1 Main Aircraft Bus charge power Red 2 Aux Battery trickle charge Always ON Purple yellow 3 Aircraft ground Black 4 Back up power master switch White...

Page 12: ...g 20 awg www tcwtech com Emmaus PA USA MODEL IBBS 12V 2AH Input 10 15 volts DC Output 12 volts 3 amps Capacity 2 amp hours INTEGRATED Back up Battery SYSTEM Pin 1 Main Aircraft Bus Pin 2 Aux Battery t...

Page 13: ...hout back up power inputs Equipment without Back up Power Input 2 amps 10 amp Main Aircraft Bus Aux Battery trickle charge Back up Power Master cpc connector INFO Low active signal High battery voltag...

Page 14: ...x Battery trickle charge Back up Power Master cpc connector INFO Low active signal High battery voltage Back up power input 20 awg 22 awg 22 awg 20 awg 20 awg 22 awg 20 awg www tcwtech com Emmaus PA U...

Page 15: ...REV 2 3 2012 TCW Technologies LLC 15 Main Aircraft Bus 20 awg Shielded...

Page 16: ...REV 2 3 2012 TCW Technologies LLC 16...

Page 17: ...Emmaus PA or such place as TCW may designate freight prepaid PRODUCT IMPROVEMENTS TCW reserves the right to change or improve its products or any portions thereof without being obligated to provide su...

Reviews: