36
4.2
Preparation for Use
In order to be operational, the power supply must be connected to an appropriate AC source. The AC
source voltage should be within the power supply specification. Do not apply power before reading the
safety instructions and Section 4.7.
Table 4-1 below, describes the basic setup procedure. Follow the instructions in Table 4-1 in the
sequence given to prepare the power supply for use.
Step no. Item
Description
Reference
1
Inspection
Initial physical inspection of the power supply
Section 4.3
2
Installation
Installing the power supply, Ensuring adequate
ventilation.
3
AC source
AC source requirements
Connecting the power supply to the AC source.
Section 4.7
4
Test
Turn-on checkout procedure.
Section 4.8
5
Load connection
Wire size selection. Local /Remote sensing. Single or
multiple loads.
Section 4.9
6
Default setting
The power supply setting at shipment.
User Manual
Table 4-1: Basic Setup Procedure
4.3
Initial Inspection
Prior to shipment this power supply was inspected and found free of mechanical or electrical defects.
Upon unpacking of the power supply, inspect for any damage which may have occurred in transit. The
inspection should confirm that there is no exterior damage to the power supply such as broken knobs
or connectors and that the front panel and meter faces are not scratched or cracked. Keep all packing
material until the inspection has been completed. If damage is detected, file a claim with carrier
immediately and notify the TDK-Lambda sales or service facility nearest you.