3
V
ersa
s
afe
TM
I
nsTallaTIon
This document contains the information necessary for the preparation and installation of a Triton VersaSafe™. It’s impor-
tant that the site complies with the requirements specified in this document. In addition, electrical wiring and mechanical
systems must also comply with all relevant laws and regulations.
The site must be prepared by the customer or his agent who is fully conversant with the requirements of installing elec-
tronic equipment. The responsibility for ensuring that the site is prepared in compliance with this document remains with
the customer.
For information and guidance only, a list is provided in general terms of those matters for which the customer is responsible.
The list is not intended to be comprehensive and in no way modifies, alters, or limits the responsibility of the customer
for all aspects of adequate site preparation.
1. Location of the equipment and site preparation. Ensure the site selected minimizes the possibility of liquid or food
spills.
2. Site wiring (power, communication). Ensure access will not be hindered by cabinet placement.
3. Location of other equipment that may cause electrical, electromagnetic or heat induced interference.
4. Make building alterations to meet wiring and other site requirements.
s
ite
C
omPlianCe
SITE PREPARATION CHECKLIST
1. Select site and design floor plan accordingly
2. Ensure all environmental conditions are met
3. Establish contractor and vendor schedules
4. Check communication line requirements
5. Plan installation and accessory needs before
starting
6. Check floor plan and make necessary altera-
tions
7. Install all required electrical fixtures
8. Prepare site for communications needs
9. Plan operator/training exercises (optional)
10. Install communication lines and test
11. Ensure installation accessories are available
5. Install all communication cables, wall jacks, and associated hardware.
6. Provide and install necessary power distribution boxes, conduits, and
grounds.
7. Ensure all applicable codes, regulations, and laws (electrical, building,
safety) are adhered to.
8. Ensure the environmental requirements of this unit are met.