background image

3

V

ersa

s

afe

TM

 I

nsTallaTIon

This document contains the information necessary for the preparation and installation of a Triton VersaSafe™. It’s impor-

tant that the site complies with the requirements specified in this document. In addition, electrical wiring and mechanical 

systems must also comply with all relevant laws and regulations.
The site must be prepared by the customer or his agent who is fully conversant with the requirements of installing elec-

tronic equipment. The responsibility for ensuring that the site is prepared in compliance with this document remains with 

the customer.
For information and guidance only, a list is provided in general terms of those matters for which the customer is responsible.  

The list is not intended to be comprehensive and in no way modifies, alters, or limits the responsibility of the customer 

for all aspects of adequate site preparation.
1.  Location of the equipment and site preparation. Ensure the site selected minimizes the possibility of liquid or food 

spills.

2.  Site wiring (power, communication). Ensure access will not be hindered by cabinet placement.
3.  Location of other equipment that may cause electrical, electromagnetic or heat induced interference.
4.  Make building alterations to meet wiring and other site requirements.

s

ite

 C

omPlianCe

SITE PREPARATION CHECKLIST

1. Select site and design floor plan accordingly
2. Ensure all environmental conditions are met
3. Establish contractor and vendor schedules
4. Check communication line requirements
5. Plan installation and accessory needs before 

starting
6. Check floor plan and make necessary altera-

tions
7. Install all required electrical fixtures
8. Prepare site for communications needs
9. Plan operator/training exercises (optional)
10. Install communication lines and test
11. Ensure installation accessories are available

5.  Install all communication cables, wall jacks, and associated hardware.
6.  Provide and install necessary power distribution boxes, conduits, and 

grounds.

7.  Ensure all applicable codes, regulations, and laws (electrical, building, 

safety) are adhered to.

8.  Ensure the environmental requirements of this unit are met.

Summary of Contents for Triton VersaSafe

Page 1: ...on and Installation TDN 07103 00335 May 17 2012 Corporate Headquarters 21405 B Street Long Beach MS 39560 PHONE 800 259 6672 FAX 228 868 9445 2012 Triton All Rights Reserved TRITON logo is a registere...

Page 2: ...Describes anchoring the cabinet using standard steel or the optional chemical anchors Anchors provided separately Power and Communication Shows cable access area power requirements and powering up th...

Page 3: ...mizes the possibility of liquid or food spills 2 Site wiring power communication Ensure access will not be hindered by cabinet placement 3 Location of other equipment that may cause electrical electro...

Page 4: ...ted ground Dedicated source TheVersaSafe AC power feed will be a dedicated line to which no other electrical devices are connected The VersaSafe power line will be wired for a single duplex style outl...

Page 5: ...ess Unit shown with Bill Acceptor bracket extended En sure there is adequate room for the door to swing open DO NOT be tempted to place the cabi net on a table or other support Severe injury and equip...

Page 6: ...6 VersaSafeTM Installation Dimensions Deep Cabinet Physical Dimensions...

Page 7: ...nstalled 10 Remove the 4 four bolts and or nuts retaining the unit to the pallet UNLOCKING COMBINATION LOCKS Electronic Lock The combination of the lock is preset to 1 2 3 4 5 6 To unlock enter the pr...

Page 8: ...he previous step Drill the pilot holes approximately 1 2 12 mm deep into the floor These holes will help guide the masonry bit that will be used to drill the anchor bolt holes in the next step 3 Stand...

Page 9: ...to mounting holes Tap anchor mounts into mounting holes 4 Place a bolt into mount then place flat washer on the anchor bolt followed by a 1 2 13mm nut on top to secure Do not tighten fully allow for l...

Page 10: ...the cabinet not to be level 2 Begin by inserting a Chem Stud capsule into one of the mounting holes Either end of the capsule may be inserted first 3 Place a washer and a nut in that order onto a chis...

Page 11: ...dhesive to cure for the specified time see chart and important note which follows prior to applying any load to the anchors During the winter the hole temperature may be different than the room temper...

Page 12: ...ords are not recommended 2 AC power for the terminal should come from a dedicated source with an isolated ground The unit is designed to work on an IT Isolated Terra type power system having a phase t...

Page 13: ...board and serve as its power supply Use TY wraps to bundle cables if necessary The TDL Gateway modem will mount atop the units power supply A USB cable will provide power to the unit from the system s...

Page 14: ...height Ensure the four 4 mounting points between the VersaSafeTM and the Plinth are secure Do not be tempt ed to use less than the four 4 pieces of hardware supplied If more than one Plinth is used en...

Page 15: ...Appendix A Software License Agreement Compliance Emission Statements A 1...

Page 16: ...ense to use the ATM Software but only in connection with the operation of this ATM subject to the terms and restrictions set forth in this License Agreement You are not permitted to use the ATM Softwa...

Page 17: ...R REPRESENTATIVE HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAM AGES OR FOR ANY CLAIM BY ANY THIRD PARTY YOUR SOLE REMEDYAGAINSTTRITON FOR DEFECTIVE PERFORMANCE OFTHEATM SOFTWARE WILL BE LIMITED EXCL...

Page 18: ...otection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in a...

Page 19: ...Appendix B Warranty Service Statement B 1...

Page 20: ...AR PURCHASE LIMITATION OF LIABILITY IN NO EVENT SHALL MANUFACTURER BE LIABLE FOR LOSS OF PROFITS OR INCIDENTAL INDIRECT SPECIAL CONSEQUENTIAL OR OTHER SIMILAR DAMAGES ARISING OUT OF ANY BREACH OF THIS...

Page 21: ...ibutor s use of the goods or any of their parts by reason of infringement of a patent or other intellectual property right or if in Manufacturer s opinion the goods are likely to become the subject of...

Page 22: ...code on a unit or any component thereof or any attempt to repair a unit or to repair or replace any component by anyone other than a service technician authorized by Triton shall void this warranty W...

Page 23: ...ment is shipped Free On Board FOB Triton s facilities The organization or individual who has purchased the equipment assumes responsibility for the equipment once it leaves Triton s facilities Should...

Page 24: ...d Therefore we will not ship primary structural parts such as a cabinet head or main cabinet body for repair in the field Triton s Technical Services Department The primary purpose of the Technical Se...

Page 25: ...fication as a service technician or the serial number of a Triton terminal Technical support is provided during normal business hours for the life of the product When calling for help with an operatio...

Page 26: ...B 8 Appendix B This Page Intentionally Left Blank...

Reviews: