Cable preparation
Overlap the cable ends as shown in the drawing.
Mark the reference line in the middle of the overlap.
Remove the cable oversheath according to the dimensions in
Table 1
.
Bend and position the cores as shown in drawing
A
. If required, cross the cores on the longer cable side.
Cut the cores at the reference line.
Cut back the core insulation on all cores to:
I = half connector length.
150
a
b
l
l
150
A
Reference line
Cable jacket
Insulation
Reference line
cut
remove
Table 1
Dimensions according to DIN 47640
Joint Type
Cross-
section
Cutback
dimensions
a
b
(mm
2
)
(mm)
(mm)
LJSM-(B)-4X/004-016
4 – 16
150
80
LJSM-(B)-4X/016-050
16 – 50
200
95
LJSM-(B)-4X/035-095
35 – 95
240
130
LJSM-(B)-4X/035-150
35 – 150
350
160
LJSM-(B)-4X/095-240
95 – 240
450
210
LJSM-5X/01.5-006
1,5 – 6
100
60
LJSM-(B)-5X/004-016
4 – 16
150
80
LJSM-(B)-5X/016-035
16 – 35
200
100