Tyco Electronics Corporation
300 Constitutional Drive
Menlo Park, CA 94025 USA
No: RPIP-824-00
Rev: F
Date: April 28, 2006
Page: 5 of 11
© 2005-2006 Tyco Electronics Corporation. All rights reserved.
Unless otherwise specified dimensions are in millimeters [Inches dimensions are in between brackets]
If this document is printed it becomes uncontrolled. Check for the latest revision.
•
For a small gauge wires, (up to 1mm
2
), and when a mechanical attachment is required,
secure the 2 wire ends, by twisting them together. Align carefully the strands in order
to avoid any poke through of the sleeve. See Fig. 1 and Fig. 2.
In other cases, align wires in such a manner that all strands are parallel.
Then, slide the sleeve over the splice area and center the solder preform of the sleeve at the
center of the splice length.
Fig. 1
Fig. 2
2.
The splicing operation is made easier by using the recommended holding fixture
(AD-1319), keeping the wires aligned and the sleeve positioned during the termination.
3. Heat solder preform until it melts and forms a fillet between the conductors.