background image

If parallel, only one joist is required. Mark the center 

of the joist near where you will install the ceiling 

plates. If the joists are covered with drywall, use a 

stud finder to locate and mark the center of the 

joists.

If perpendicular, 3 joists are required.  Choose 3 

joists that have a gap between them that is closest 

to the distance you found in Step 1. Mark the center 

of the joists you are using near where the ceiling 

plates will be installed. If the joists are covered with 

drywall, use a stud finder to locate and mark the 

center of the joists.

3

3

4

Parallel Mounting:

Perpendicular Mounting:

Pre-drill pilot holes in the ceiling joists at the locations you marked with a 3/16” (5mm) drill bit

Hold the ceiling plates against the ceiling at the centerline of the joist and mark the hole locations 

with a pencil at the center of the slots.

5

To determine where you will install the Wall Cleat (E), find a location on a wall near the end of the 

Brake Pulley Plate (B) where the rope comes out. The wall cleat should be mounted at an easy height 

to reach but out of the way, somewhere around shoulder height. It is best to mount the wall cleat 

into a wall stud, but a drywall anchor can also be used. 

a. If mounting wall cleat to a stud:  use a stud finder to locate a wall stud near where the rope 

comes out, then use a stud finder to mark the stud centerline at the height you will mount the wall 

cleat. Pre-drill pilot holes with a 3/32” (2.5mm) drill bit. Install the wall cleat with the Wood Screws 

(J) in the pilot holes. 

b. If mounting the wall cleat to drywall:  it is recommended to use a stud finder or wire detector to 

ensure you do not drill into electrical wires, plumbing lines, or anything else behind the drywall. 

Drill anchor holes with a 3/16” (5mm) drill bit. Press the Drywall Anchors (K) into the holes, then 

install the wall cleat with the Wood Screws (J) into the drywall anchors.

7

Install the ceiling plates with Lag Screws (I) and Washers (H) into the pilot holes using a 12mm 

socket. Look at the overview images in the beginning and make sure the ceiling plates are in the 

correct orientation when mounting.

6

Parallel Mounting:

Perpendicular Mounting:

Summary of Contents for ELITE HOIST

Page 1: ...INSTALLATION GUIDE ELITE HOIST support tealtriangle com Contact us at Questions or Concerns SCAN THIS QR CODE FOR THE FULL INSTALL VIDEO SCAN THIS QR CODE FOR EXTRA TIPS FOR INSTALLING THIS PRODUCT...

Page 2: ...to install and use your Elite Hoist The instructions are written for a person with a basic understanding of tools and procedures Read the entire manual before proceeding If you do not understand any...

Page 3: ...em Check tightness of all bolts and screws periodically Failure to properly maintain the system could result in damage to property or injury SAFETY WARNING NOTES Read the instructions all the way thro...

Page 4: ...refer to it during installation Get to Know Your Hoist Overview of Parts and How it Works A B F L C G G D Ending Knot Rope Loops at End You Pull 2 Ropes Each Rope Controls 1 Strap Bracket C or D Star...

Page 5: ...t the end of the object you are storing as shown in the image Plan and Install Parts 1 You must mount the Ceiling Plates to wood ceiling joists Find the direction of your joists and deter mine where y...

Page 6: ...he rope comes out The wall cleat should be mounted at an easy height to reach but out of the way somewhere around shoulder height It is best to mount the wall cleat into a wall stud but a drywall anch...

Page 7: ...e starting knot pull the rope through your hands to make sure it is smooth and loosely coil it on the ground 4 The Double Pulley Plate L and Brake Pulley Plate B each have two pulleys and the Brake Pu...

Page 8: ...n Figure Pull rope coil through Brake Hole 1 until Strap Bracket 1 C is about to lift off the ground Loosely coil the rest of the rope on the ground below the Brake Pulley Plate B 3 4 5 6 Down and aro...

Page 9: ...7 8 Around Double Pulley Plate L Pulley 2 down toward Strap Bracket 2 D Around the pulley on Strap Bracket 2 D and up toward Double Pulley Plate L Tie the same knot in the knot hole on Double Pulley P...

Page 10: ...below the hoist and use the rope and brake to set the Strap Brackets C D to a height just above the object Place the Straps G underneath the object you are storing so that the ends come over the top...

Page 11: ...t and guide the strap end from the bottom through the slot in the silicone buckle cover and through the opening in the buckle The buckle must be used with the strap coming up through the bottom and ou...

Reviews: