background image

 

 

4.2.5 Hot water for USE 

There is a serpentine(flex pipe) system for hot water. In the serpentine system, 

pressure reducers, valves or spiral hose must be used for hot-cold inlet-outlet. In 

addition, if there is any problem in the product by connecting the serpentine 

system heat safety valve (power failure, etc.), and the boiler water temperature 

rises to 95 ºC, it opens the way of the heat exchanger to allow the cold water to 

circulate in the boiler and helps to reduce the heat of the boiler water and prevent 

it from going out again. 

 

4.2.6 Chimney Connection 

For stove connection steel sheet flue pipes of 2mm thickness must be used. Stove 

pipe must be connected to stove chimney output and chimney firmly. This strong 

and close connection is also compulsory for flue pipes. After connecting flue pipe to 

the chimney, remaining gaps around chimney must be closed with sealing and 

fireproof materials. When the distance between stove and chimney is long, 

horizontal connection must be avoided.  Chimney pipe must be installed according 

to the direction of the chimney. When the distance is short at least 1meter length 

flue pipe must be used and must be installed vertically.

 

The chimney to be used at the exhaust gas outlet can be multiple chimney 

connection (See Chimney Assembly Diagram) 

CAUTION: Do not burn the stove when the flue pipe is connected. First of all, 

the radiator installation must be done ( Otherwise stove burned without 

water can lead to stove deformations). Our company is not responsible for 

damages caused by burning without water.  

The chimney connection should be done according to DIN4705. 

 

 

4.2.7 Radiator Installation Connection  

Stove radiator plumbing connections should be installed by an expert or qualified 

person to guarantee a technically correct operation. Our company is not 

responsible for any mistakes that will occur while installing and assembling. 

The radiator wiring connection of the stove should only be made with quality and 

tried-and-tested safety equipment. 

Plumbing main line pipes, for metal and plastic PVC Pipes sh

ould be at least 1’’. In a 

heating system installed like this, the circulation ( hot water circulation ) will be 

easy, comfortable and the temperature of radiators is felt earlier. The main line 

pipes of the last few radiators can be ¾” metal and a plastic

 PVC pipe. 

Summary of Contents for T-25

Page 1: ...Installation Manual Central Heating Stove With Solid Fuel Model T 25 Tested according to DIN EN 13240 For product efficiency and emission values see the declaration of conformity TR...

Page 2: ...Mechanical Thermostat 7 4 2 4 Indicator Panel 8 4 2 5 Hot water for USE 9 4 2 6 Chimney Connection 9 4 2 7 Radiator Installation Connection 9 5 STOVE WORK PRINCIPLES 10 5 1 SUITABLE FUEL 10 5 2 FIRST...

Page 3: ...ystem The thermostat in the product ensures that the circulation pump prevents automatically thus avoids the continuous consumption of the electricity Circulation pump works quietly and the electricit...

Page 4: ...INST FREEZING MUST BE TAKEN INTO CONSIDERATION All the required standard examinations are tested for the product The predicted parameters associated with combustion efficiency and exhaust gas emission...

Page 5: ...e best possible way However the stove or its accessories may still be damaged during transport Therefore after removing the stove from the package check whether it is complete and undamaged In case of...

Page 6: ...inner edge of the fire chamber cover You can order the floor protection plate from seller when you require 4 2 STOVE INSTALLATION AND CONNECTION Product installation and assembly should be done accord...

Page 7: ...the expansion tank please check the water level fill the water up to half of the expansion tank 4 2 2 Circulation Pump Circulation pump and bypass line should be installed to the input of the radiator...

Page 8: ...ou can set the Mechanical Thermostat to the required temperature it should not be under 40 C otherwise it will not cause rapid combustion 4 2 4 Indicator Panel Electric Lamp The electric lamp starts t...

Page 9: ...he chimney When the distance is short at least 1meter length flue pipe must be used and must be installed vertically The chimney to be used at the exhaust gas outlet can be multiple chimney connection...

Page 10: ...bustion is listed in the attached information sheet CAUTION Since wood is not a permanently combustible fuel it is impossible to heat overnight CAUTION Never use wallpaper chipboard waste plastic or t...

Page 11: ...If you burn it carefully you will prevent the formation of cracks in the insulating stones damage the paint and deterioration of the material The smell caused by the protective paint on the stove is...

Page 12: ...ding to the Ministry of Environment Applications are for example Wood that is moist and treated with protection Thin sawdust Paper and paperboard except ignition Bark and hardboard waste Plastic and o...

Page 13: ...ssembly scheme The boiler does not reach the desired temperature Check Fuel Type Chimney emission may be low Check the combustion chamber for sufficient air supply The desired temperature is not reach...

Page 14: ...uct our company will try to repair this damage as soon as possible within the warranty period or it will replace the problematic part Only spare parts approved or supplied by the manufacturer must be...

Reviews: