6 - Preventive Maintenance and Repair
Maintenance Schedule
40 / 54
Tecan Vacuum Separator (Te-VacS™) Operating Manual, 391236, en, V4.0
6.3.2 Monthly Maintenance Table
The following preventive maintenance tasks must be performed at the end of each
month or after 160 hours of operation.
Component
Maintenance
Task
Cleaning Agent
Reference
Maintenance Activi-
ties
Base plate vac-
uum block
Check the sealing
Silicone grease
If the sealing sticks to
the microplate, clean
and lubricate the seal-
ing with silicone grease.
Vacuum block
Sealing
Clean and flush
Silicone grease
If the sealing sticks to
the microplate or if salt
is crystalized on the
surface, clean and lubri-
cate the sealing with sil-
icone grease.
Table 6:
Monthly maintenance
See also
2