13
Additional parameters to be configured (additional submenu in service menu):
•
Installation options: heating activation delta, from hour... to hour..., energy return, energy return threshold,
energy return hysteresis, energy return solar pump.
SCHEME 6/17
–
TWO TANKS, VALVE
Installation 6/17 supports:
➔
collector pump,
➔
tank switching valve,
➔
two accumulation tanks,
➔
one direction of collector positioning,
➔
additional peripherals.
Installation sensors:
➔
collector sensor,
➔
sensors of accumulation tanks.
Additional parameters to be configured:
•
pre-set temperature of tank 2
•
maximum temperature of tank 2
•
tank 2 hysteresis
•
oscillation charging
•
oscillation pause
•
maximum heating time Z2
•
valve hysteresis
SCHEME 7/17
–
TWO TANKS, TWO PUMPS
Installation 7/17 supports:
➔
two collector pumps,
➔
two accumulation tanks,
➔
one direction of collector positioning,
➔
additional peripherals.
Installation sensors:
➔
collector sensor,
➔
sensors of accumulation tanks.
Additional parameters to be configured:
•
valve hysteresis
•
pre-set temperature of tank 2
•
maximum temperature of tank 2
•
tank 2 hysteresis
•
operation algorithm
•
oscillation charging
•
oscillation pause
•
maximum heating time Z2
•
pump 2 deactivation delta
•
pump 2 activation delta